PRECISE LIGHTING FOR DS ARENA

DS ARENA, HOBRO, DENMARK

Project Benefits:
 
  • More Light And Lower Energy Consumption:
    The new lighting solution provides higher light levels across the facility and can reduce energy consumption by 25–40%.
  • Minimized Light Spill:
    The solution was designed with a strong focus on limiting spill light and back light in the areas surrounding the stadium.
  • Reliable Upgrade:
    The existing 2,000 W metal halide lamps had failed and were no longer available. A new and reliable solution was therefore required.
  • Approved Solution:
    The solution is approved by the Danish Football Association (DBU), and both players and staff at Hobro IK are pleased with the result.
 
 
Project info:
 
  • Customer: Hobro IK
  • Installation: Lillegaarden El A/S
  • Location: DS Arena, Hobro, Denmark
  • Application: Sports Lighting
  • Technology: LED luminaires
  • Year: 2026
  • Product: 
    Floodlight Arena FL AR QU S 1500W T857 15DEG DMX,
    EAN: 4099854780998
LEDVANCE’s lighting solution involving a complete replacement of the DS Arena stadium lighting in Hobro, delivers higher light levels, lower energy consumption and reduced light spill, making it fully compliant with the requirements of the Danish Football Association (DBU).

the challenge

Many of the stadium’s existing floodlights were out of operation due to failed 2,000 W metal halide lamps. The lamps had been discontinued and were no longer available. Hobro IK therefore needed a new solution to ensure reliable operation and improved lighting conditions on the pitch. Special consideration also had to be given to the relatively low lighting masts and the stadium’s proximity to both woodland areas and educational facilities. As a result, precise light control and the reduction of light spill were key requirements for the project. Furthermore, Hobro IK wanted to meet the relevant licensing requirements.

the solution

In cooperation with Managing Director Mads Justesen, LEDVANCE developed a proposal to replace all floodlights at the facility. The installation comprised 108 LED floodlights together with accessories such as special reflectors, base caps, mounting materials and safety wires. The project was developed with a focus on precise light control and the reduction of spill light and back light. The specific requirements of the stadium and its surroundings formed the basis of the design, resulting in a lighting solution using specially adapted variants with different optical and visor combinations.

the benefits

The new solution provides Hobro IK with higher light levels and the potential for energy savings of 25–40%. The combination of increased light levels, precise light control and lower energy consumption delivers a solution tailored to both the stadium’s requirements and its surroundings. In addition, the solution ensures compliance with DBU requirements.

SUMMARY

At DS Arena, Hobro IK has received a new LED-based stadium lighting solution replacing an outdated and discontinued installation. The project combines higher light levels, lower energy consumption and improved control of light spill while taking the surrounding environment into consideration.
We needed better lighting on the pitch while keeping spill light to the surroundings to a minimum. It was also important that the installation met the licensing requirements. We got exactly that with the new solution.
Mads Justesen, Managing Director, Hobro IK

DOWNLOAD

PRECISE LIGHTING FOR DS ARENA

Our lighting projects

Be inspired by our lighting projects.

interested in related contents?